Strand Reservoir Site Alternatives Evaluation Report

During the comment period for the Reservoir replacement project, some general comments were received with respect to the current design criteria and location of the proposal by FPB staff. In an effort to be open and transparent, the FPB desired to have our consultant review the data and make recommendations as to location, size, type roof, and which side first (North or South basin). Strand Associates has conducted a thorough review of the data and design constraints provided by staff and has made specific recommendations for the project.

View Document

 

Read More

Reservoir Public Comments and Responses

A public meeting was held on December 15, 2016 on the proposed Reservoir replacement project. The primary goal of that meeting was to inform the public about the proposed design and solicit comments about the project from the public. A public comment period was open between December 15, 2016 and January 31, 2017. As part of the engineering contract, Strand Associates along with staff, reviewed and discussed those comment received from the public comment period. 

View Document

Read More

Subscriber Policy Notice

Information about disclosure of personally identifiable subscriber information, the type of personally identifiable information we collect, how we use subscriber information, under what conditions we may disclose such information, the period during which we maintain it and the rights of subscribers concerning such information and its disclosure.

View Document

Read More

Renewable Studies Status Report

KyMEA Assessment of Renewable Energy Resources. The analyses presented in this Assessment of Renewable Resource Options are intended to be used by KyMEA to screen potential options, narrow the list for further consideration, and provide a greater understanding of the key issues that will need to be considered in structuring procurement processes and evaluating proposals received from prospective suppliers.

Read More