Strand Reservoir Site Alternatives Evaluation Report
/During the comment period for the Reservoir replacement project, some general comments were received with respect to the current design criteria and location of the proposal by FPB staff. In an effort to be open and transparent, the FPB desired to have our consultant review the data and make recommendations as to location, size, type roof, and which side first (North or South basin). Strand Associates has conducted a thorough review of the data and design constraints provided by staff and has made specific recommendations for the project.