FPB Document Catalog
FPB makes every effort to ensure its customers have the tools and resources necessary to be well informed and prepared for handling their utility needs. If you feel we've missed something, would like to suggest a document, or leave a comment, please fill out the short form below and let us know. Thank you.
Scroll down to browse the Document Catalog or sort the catalog Archive by category
Recently Added Documents
FPB will hold a board meeting on Tuesday, December 17, 2024, at 5:00 p.m.
Frankfort Plant Board is soliciting qualified vendors to implement ArcFM Fiber Manager XI. The objective is to enhance our geospatial data management and fiber network planning capabilities through a complete implementation, including installation, customization, data migration, training, and support. Deadline is January 10, 2025 @ 5:00PM
FPB financial audit report for year ended June 30, 2024.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Wednesday, December 4, 2024, at 12:00 noon.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The Board Members will not be present in person for the meeting.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
Separate sealed Bids for clearfield cabinets will be received by the Frankfort Plant Board until December 10, 2024 at 2:00PM; and then opened and publicly read aloud.
The Frankfort Plant Board seeks responses to a Request for Proposal from a qualified service provider to assist in the development of a Business Continuity (BCP) and Disaster Recovery Plan (DRP). Deadline is January 6, 2025 at 2:00PM.
FPB will hold a board meeting on Tuesday, November 19, 2024, at 5:00 p.m.
Separate sealed Bids for fiber optic cable will be received by the Frankfort Plant Board until December 5, 2024 at 2:30PM; and then opened and publicly read aloud.
Sealed Bids for the furnishing of materials with all related appurtenances will be received by the Frankfort Plant Board until 2:00 PM local time, December 5, 2024; and then opened and publicly read aloud.
Separate sealed Bids for Pad Mount Transformers will be received by the Frankfort Plant Board until 1:30PM local time, December 5, 2024; and then opened and publicly read aloud.
The Electric and Water Plant Board of the City of Frankfort, Kentucky issues this
invitation to solicit bids for “Leestown Road Pump Station” as described in the
hereto instructions and specification document. Any and all exceptions to the
specifications shall be noted and fully explained. However, as deemed by the Plant
Board, any and all exceptions shall be equal or exceed the specifications. Exceptions for
material items determined to be less equal than specified items shall be basis to reject a
bid.
Separate sealed Bids for Renewable Pad Mount Transformer will be received by the Frankfort Plant Board until 2:00PM local time, November 12, 2024 and then opened and publicly read aloud.
The Frankfort Electric and Water Plant Board (FPB) is requesting proposals from qualified contractors for services related to construction of a potable water booster pump station. Deadline to respond is October 31, 2024 @ 2:00 p.m.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Regular Meeting of the Frankfort Plant Board for Tuesday, October 15, 2024, at 5:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. One or more Board Members will not be present in person for the meeting.
The primary location of the video teleconference where all members can be seen and heard by video and the public may attend is: the FPB Administration Building, 151 Flynn Avenue, Frankfort, KY 40601.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard & on FPB Cable 10 and HD on Channel 510.
FPB is requesting qualifications for General Consulting Services For Water Treatment, Water Distribution, Water Storage, Pumping, Electrical, and Environmental. The deadline to contact FPB is October 18, 2024.
Separate sealed Bids for Metal Poles will be received by the Frankfort Plant Board until 2:00 p.m. local time October 2, 2024; and then opened and publicly read aloud.
The Frankfort Plant Board is soliciting proposals from qualified solar PV providers to design, engineer, build, a turn-key installation of ground-mount solar photovoltaic (PV) project. Deadline to respond is September 25, 2024 at 2pm.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Monday, September 16, 2024, at 5:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The primary physical location of the video teleconference where all members can be seen and heard and the public may attend is the FPB Administration Building located at 151 Flynn Avenue, Frankfort, KY 40601.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
The Frankfort Electric and Water Plant Board (FPB) is requesting proposals from qualified contractors for services related to construction of a potable water booster pump station. Deadline to respond is October 4, 2024 @ 2:00pm.
Electric, Water, Cable-Telecom Fiscal years beginning 2024-2025
The Frankfort Electric and Water Plant Board (FPB) is requesting proposals from qualified contractors for services related to janitorial services. Deadline to respond is September 25, 2024 by 2:00 p.m.
FPB will hold a board meeting on Tuesday, August 20, 2024 @ 5:00 PM.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Wednesday, July 24, 2024, at 5:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The physical location of the meeting will be the Community Room at the FPB Administration Building located at 151 Flynn Avenue, Frankfort, KY 40601.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb, www.youtube.com/frankfortplantboard & on FPB Cable 10 and HD on Channel 510.
The Electric and Water Plant Board of the City of Frankfort, Kentucky issues this invitation to solicit bids for delivery and supply of AWWA Class C900 PVC 10 inch DR 18 blue pipe, integral bell and spigot ends with gasket and lubricant. Deadline is August 5, 2024 at 2:00PM.
Separate sealed Bids for fiber optic cable will be received by the Frankfort Plant Board until July 22, 2024 at 2:00PM; and then opened and publicly read aloud.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Tuesday, July 2, 2024, at 10:00 a.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The Board Members will not be present in person for the meeting.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
Separate sealed Bids for a Wireless Digital Trunking Communication System will be received by the Frankfort Plant Board until 2:00 pm. local time, July 9, 2024; and then opened and publicly read aloud.
A Regular Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held in the Community Room at the FPB Administration Building located at 151 Flynn Ave, Frankfort, KY 40601 on Tuesday, June 18, 2024, beginning at 5:00 p.m. or as soon thereafter as possible.
The Electric and Water Plant Board of the City of Frankfort, KY will conduct a Public Hearing on Tuesday, June 18th, 2024, at 5:00 p.m. or as soon thereafter as can be heard, at the FPB Administration Building located at 151 Flynn Ave., Frankfort, KY 40601 to solicit oral or written comments regarding electric tariff revisions related to area lighting, net metering applications and transfer of credits, and a time-of-use residential pilot program. A summary of the proposed changes are provided below.
Area Lighting - Fix a typographical error related to rates for 371 W LED fixtures. Establish a new tariff section to separate out pole rental rates into a different line item.
Net Metering - Proposed retirement of the $10 application fee for new net metering customers. Clarify and set limits to transfer of energy credits between electric accounts.
Time-of-Use Rates - Revise the electric tariff to include a pilot time-of-use rate for residential electric customers. Proposed rate schedule will include an on peak, off peak, and super off peak time period for summer and winter seasons. The pilot program will be limited to the first 200 customers requesting service under this rate.
Public comments will be accepted for the public hearing by emailing comments to kpoe@fewpb.com or clindsey@fewpb.com by Tuesday, June 18, 2024. Those wishing to speak in person at the meeting should notify kpoe@fewpb.com or clindsey@fewpb.com by Tuesday, June 18, 2024.
The current and proposed policies are available to the public at the Frankfort Plant Board Administration building located at 151 Flynn Avenue, Frankfort, Kentucky 40601, online at www.fpb.cc, via email to Travis McCullar at tmccullar@fewpb.com or by calling Travis McCullar at 502-352-4608.
The new Policy is proposed to be effective on September 1st, 2024.
A Special Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held in the Community Room at the FPB Administration Building located at 151 Flynn Ave, Frankfort, KY 40601 on Wednesday, June 5, 2024, beginning at 10:00 a.m. or as soon thereafter as possible.
FPB Bids
Frankfort Plant Board is soliciting qualified vendors to implement ArcFM Fiber Manager XI. The objective is to enhance our geospatial data management and fiber network planning capabilities through a complete implementation, including installation, customization, data migration, training, and support. Deadline is January 10, 2025 @ 5:00PM
Separate sealed Bids for clearfield cabinets will be received by the Frankfort Plant Board until December 10, 2024 at 2:00PM; and then opened and publicly read aloud.
The Frankfort Plant Board seeks responses to a Request for Proposal from a qualified service provider to assist in the development of a Business Continuity (BCP) and Disaster Recovery Plan (DRP). Deadline is January 6, 2025 at 2:00PM.
Separate sealed Bids for fiber optic cable will be received by the Frankfort Plant Board until December 5, 2024 at 2:30PM; and then opened and publicly read aloud.
Sealed Bids for the furnishing of materials with all related appurtenances will be received by the Frankfort Plant Board until 2:00 PM local time, December 5, 2024; and then opened and publicly read aloud.
Separate sealed Bids for Pad Mount Transformers will be received by the Frankfort Plant Board until 1:30PM local time, December 5, 2024; and then opened and publicly read aloud.
The Electric and Water Plant Board of the City of Frankfort, Kentucky issues this
invitation to solicit bids for “Leestown Road Pump Station” as described in the
hereto instructions and specification document. Any and all exceptions to the
specifications shall be noted and fully explained. However, as deemed by the Plant
Board, any and all exceptions shall be equal or exceed the specifications. Exceptions for
material items determined to be less equal than specified items shall be basis to reject a
bid.
Separate sealed Bids for Renewable Pad Mount Transformer will be received by the Frankfort Plant Board until 2:00PM local time, November 12, 2024 and then opened and publicly read aloud.
The Frankfort Electric and Water Plant Board (FPB) is requesting proposals from qualified contractors for services related to construction of a potable water booster pump station. Deadline to respond is October 31, 2024 @ 2:00 p.m.
FPB is requesting qualifications for General Consulting Services For Water Treatment, Water Distribution, Water Storage, Pumping, Electrical, and Environmental. The deadline to contact FPB is October 18, 2024.
Separate sealed Bids for Metal Poles will be received by the Frankfort Plant Board until 2:00 p.m. local time October 2, 2024; and then opened and publicly read aloud.
The Frankfort Plant Board is soliciting proposals from qualified solar PV providers to design, engineer, build, a turn-key installation of ground-mount solar photovoltaic (PV) project. Deadline to respond is September 25, 2024 at 2pm.
The Frankfort Electric and Water Plant Board (FPB) is requesting proposals from qualified contractors for services related to construction of a potable water booster pump station. Deadline to respond is October 4, 2024 @ 2:00pm.
The Frankfort Electric and Water Plant Board (FPB) is requesting proposals from qualified contractors for services related to janitorial services. Deadline to respond is September 25, 2024 by 2:00 p.m.
The Electric and Water Plant Board of the City of Frankfort, Kentucky issues this invitation to solicit bids for delivery and supply of AWWA Class C900 PVC 10 inch DR 18 blue pipe, integral bell and spigot ends with gasket and lubricant. Deadline is August 5, 2024 at 2:00PM.
Separate sealed Bids for fiber optic cable will be received by the Frankfort Plant Board until July 22, 2024 at 2:00PM; and then opened and publicly read aloud.
Separate sealed Bids for a Wireless Digital Trunking Communication System will be received by the Frankfort Plant Board until 2:00 pm. local time, July 9, 2024; and then opened and publicly read aloud.
The Frankfort Electric and Water Plant Board (FPB) is requesting proposals from qualified contractors for services related to renovating the clubhouse. Deadline to respond is June 17, 2024 by 2:00 p.m.
Separate sealed Bids for Wood Poles will be received by the Frankfort Plant Board until 2:00 pm. local time, June 4, 2024; and then opened and publicly read aloud.
Separate sealed Bids for Bulk Sodium Chloride will be received by the Frankfort Plant Board at 305 Hickory Dr. Frankfort, KY 40601 until 1:30 p.m. local time, June 4, 2024; and then opened and publicly read aloud.
The Electric and Water Plant Board of the City of Frankfort, Kentucky issues this invitation to solicit bids on Ductile Iron Pipe, Valves, Hydrants, Ductile Iron Fittings, and Tapping Sleeves. Our estimated requirements for these items for the period of July 1, 2024 - June 30, 2025 are set forth in the hereto 23-page specification and instruction document. These quantities are estimated; therefore we desire that you quote with the understanding that delivery will be requested when and as needed. Also, quote with the understanding that orders may either exceed or fall short of the estimated quantities. Deadline is June 3, 2024 at 1:30PM.
Separate sealed Bids for the construction of Water Treatment Plant Filter Isolation Valve Replacement consisting of replacing existing valves in the pipe gallery with new valves & electric actuators and all related appurtenances as shown on the DRAWINGS and described in the SPECIFICATIONS will be received by Frankfort Electric & Water Plant Board at 305 Hickory Drive, Frankfort, Kentucky 40601 until 2:00 p.m. (EST Local Time) Tuesday, March 19, 2024, and then at said office publicly opened and read aloud.
Separate sealed Bids for the construction of Water Treatment Plant Filter Isolation Valve Replacement consisting of replacing existing valves in the pipe gallery with new valves & electric actuators and all related appurtenances as shown on the DRAWINGS and described in the SPECIFICATIONS will be received by Frankfort Electric & Water Plant Board at 305 Hickory Drive, Frankfort, Kentucky 40601 until 2:00 p.m. (EST Local Time) Tuesday, March 19, 2024, and then at said office publicly opened and read aloud.
The Frankfort Electric and Water Plant Board (FPB) is accepting Statements of Qualifications (SOQs) from qualified firms for professional services related to the design and development of a customer mobile application.
Deadline is March 13, 2024 @ 2:00PM
The Frankfort Plant Board (hereby referred to as “FPB” or “Board”) is soliciting proposals from qualified solar PV providers to design, engineer, build, a turn-key installation of ground-mount solar photovoltaic (PV) project at the site addresses below. The selected Contractor will be responsible for designing and constructing a nominal 1 MWDC system expanding on FPB’s existing solar facilities. Respondents shall have demonstrated experience designing, planning, scheduling, permitting and constructing complete solar PV systems, have knowledge of local utilities, provide project financial analysis and federal reimbursement support.
Deadline is February 19, 2024 @ 2:00PM
The Frankfort Plant Board invites Bidders to submit bids for metal poles. Deadline is December 28, 2023 at 2:00PM.
The Frankfort Plant Board invites Bidders to submit bids for one 69-13.8-kV 15/20/25//28 MVA substation power transformers with LTC (Goods). Deadline is December 28, 2023 at 1:30PM.
The Frankfort Plant Board (FPB) Telecommunication department is seeking responses to a Request for Proposals (RFP) from qualified engineering/design firms (referred to hereafter as “Bidder”) to complete the design of a Fiber-to-the-Premises (FTTP) network that will replace the current Hybrid Fiber Coaxial (HFC) cable plant and extend into unserved areas of Franklin County. Deadline is November 27, 2023 at 5:00PM.
Separate sealed Bids for remanufactured distribution transformers will be received by the Frankfort Plant Board until December 8, 2023 at 10:00AM; and then opened and publicly read aloud.
Separate sealed Bids for Bulk Sodium Chloride will be received by the Frankfort Plant Board until 2:00 p.m. local time, November 30, 2023; and then opened and publicly read aloud.
Operations
FPB financial audit report for year ended June 30, 2024.
FPB financial audit report for year ended June 30, 2023.
Electric & Water Plant Board of the City of Frankfort, Kentucky Financial Statements as of and for the year ending on June 30, 2022
Electric & Water Plant Board of the City of Frankfort, Kentucky Financial Statements as of and for the years ended June 30, 2021 and 2020.
Electric & Water Plant Board of the City of Frankfort, Kentucky Financial Statements as of and for the years ended June 30, 2020 and 2019.
Electric & Water Plant Board of the City of Frankfort, Kentucky Financial Statements as of and for the years ended June 30, 2019 and 2018.
Electric & Water Plant Board of the City of Frankfort, Kentucky Financial Statements as of and for the years ended June 30, 2018 and 2017.
Electric & Water Plant Board of the City of Frankfort, Kentucky Financial Statements Years Ended June 30, 2017 and 2016.
Information about disclosure of personally identifiable subscriber information, the type of personally identifiable information we collect, how we use subscriber information, under what conditions we may disclose such information, the period during which we maintain it and the rights of subscribers concerning such information and its disclosure.
Electric & Water Plant Board of the City of Frankfort, Kentucky Financial Statements Years Ended June 30, 2016 and 2015.
FPB's Tariff contains detailed information on service requirements and rules and regulations.
Public Meetings
Agendas and Board Packets
FPB will hold a board meeting on Tuesday, December 17, 2024, at 5:00 p.m.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Wednesday, December 4, 2024, at 12:00 noon.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The Board Members will not be present in person for the meeting.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
FPB will hold a board meeting on Tuesday, November 19, 2024, at 5:00 p.m.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Regular Meeting of the Frankfort Plant Board for Tuesday, October 15, 2024, at 5:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. One or more Board Members will not be present in person for the meeting.
The primary location of the video teleconference where all members can be seen and heard by video and the public may attend is: the FPB Administration Building, 151 Flynn Avenue, Frankfort, KY 40601.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard & on FPB Cable 10 and HD on Channel 510.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Monday, September 16, 2024, at 5:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The primary physical location of the video teleconference where all members can be seen and heard and the public may attend is the FPB Administration Building located at 151 Flynn Avenue, Frankfort, KY 40601.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
FPB will hold a board meeting on Tuesday, August 20, 2024 @ 5:00 PM.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Wednesday, July 24, 2024, at 5:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The physical location of the meeting will be the Community Room at the FPB Administration Building located at 151 Flynn Avenue, Frankfort, KY 40601.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb, www.youtube.com/frankfortplantboard & on FPB Cable 10 and HD on Channel 510.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Tuesday, July 2, 2024, at 10:00 a.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The Board Members will not be present in person for the meeting.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
A Regular Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held in the Community Room at the FPB Administration Building located at 151 Flynn Ave, Frankfort, KY 40601 on Tuesday, June 18, 2024, beginning at 5:00 p.m. or as soon thereafter as possible.
The Electric and Water Plant Board of the City of Frankfort, KY will conduct a Public Hearing on Tuesday, June 18th, 2024, at 5:00 p.m. or as soon thereafter as can be heard, at the FPB Administration Building located at 151 Flynn Ave., Frankfort, KY 40601 to solicit oral or written comments regarding electric tariff revisions related to area lighting, net metering applications and transfer of credits, and a time-of-use residential pilot program. A summary of the proposed changes are provided below.
Area Lighting - Fix a typographical error related to rates for 371 W LED fixtures. Establish a new tariff section to separate out pole rental rates into a different line item.
Net Metering - Proposed retirement of the $10 application fee for new net metering customers. Clarify and set limits to transfer of energy credits between electric accounts.
Time-of-Use Rates - Revise the electric tariff to include a pilot time-of-use rate for residential electric customers. Proposed rate schedule will include an on peak, off peak, and super off peak time period for summer and winter seasons. The pilot program will be limited to the first 200 customers requesting service under this rate.
Public comments will be accepted for the public hearing by emailing comments to kpoe@fewpb.com or clindsey@fewpb.com by Tuesday, June 18, 2024. Those wishing to speak in person at the meeting should notify kpoe@fewpb.com or clindsey@fewpb.com by Tuesday, June 18, 2024.
The current and proposed policies are available to the public at the Frankfort Plant Board Administration building located at 151 Flynn Avenue, Frankfort, Kentucky 40601, online at www.fpb.cc, via email to Travis McCullar at tmccullar@fewpb.com or by calling Travis McCullar at 502-352-4608.
The new Policy is proposed to be effective on September 1st, 2024.
A Special Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held in the Community Room at the FPB Administration Building located at 151 Flynn Ave, Frankfort, KY 40601 on Wednesday, June 5, 2024, beginning at 10:00 a.m. or as soon thereafter as possible.
A Special Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held in the Community Room at the FPB Administration Building located at 151 Flynn Ave, Frankfort, KY 40601 on Monday, May 20, 2024, beginning at 5:00 p.m. or as soon thereafter as possible.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Monday, April 29, 2024, at 1:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The Board Members will not be present in person for the meeting.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard & on FPB Cable 10 and HD on Channel 510.
The Ethics Committee of the Frankfort Plant Board will hold a Special Meeting on Thursday, April 18, 2024 at 1:00 P.M. at the FPB Administration Building located at 151 Flynn Avenue, Frankfort, KY 40601.
FPB will hold a board meeting on Tuesday, April 16, 2024, at 5:00 p.m.
The Ethics Committee of the Frankfort Plant Board, will hold a special meeting via video teleconference on Wednesday, April 3, 2024 at 1:00 P.M. at the FPB administration building located at 151 Flynn Avenue, Frankfort, KY 40601.
The public hearing being held today is cancelled due to potential for severe weather.
A Special Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held in the Community Room at the FPB Administration Building located at 151 Flynn Ave, Frankfort, KY 40601 on Tuesday, April 2, 2024, beginning at 5:00 p.m. or as soon thereafter as possible.
The Frankfort Electric and Water Plant Board will hold a Special Board Meeting to conduct a Public Hearing on Tuesday, April 2, 2024 at 5 p.m. at the Frankfort Plant Board Administration Building located at 151 Flynn Ave., Frankfort, Kentucky, 40601 to solicit oral or written comments regarding: (1) Increasing rate for Retrans Surcharge, (2) Increasing rate for Cable Network Pass-Through Fee, (3) Increasing rate for Bulk cable I and Bulk cable II, (4) Establishing Retention Tier lineup and Pass-Through Fee, (5) Updating Sections V, X, and XII of the Tariff..
The Frankfort Electric and Water Plant Board will hold a Special Board Meeting to conduct a Public Hearing on Tuesday, April 2, 2024 at 5 p.m. at the Frankfort Plant Board Administration Building located at 151 Flynn Ave., Frankfort, Kentucky, 40601 to solicit oral or written comments regarding: (1) Increasing rate for Retrans Surcharge, (2) Increasing rate for Cable Network Pass-Through Fee, (3) Increasing rate for Bulk cable I and Bulk cable II, (4) Establishing Retention Tier lineup and Pass-Through Fee, (5) Updating Sections V, X, and XII of the Tariff..
The meeting will be broadcast live via Frankfort Plant Board Cable 10 and Facebook Live: Frankfort Plant Board – Community Room https://www.facebook.com/fewpb/
Public comments will be accepted for the public hearing by emailing comments to cjennings@fewpb.com or clindsey@fewpb.com by Monday, April 1, 2024. Those wishing to speak at the meeting must notify cjennings@fewpb.com or clindsey@fewpb.com by Monday, April 1, 2024, so that FPB staff may email you a link to the meeting.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Regular Meeting of the Frankfort Plant Board for Tuesday, March 19, 2024, at 5:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. One or more Board Members will not be present in person for the meeting.
The primary location of the video teleconference where all members can be seen and heard by video and the public may attend is: the FPB Administration Building, 151 Flynn Avenue, Frankfort, KY 40601.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
FPB will hold a board meeting on Tuesday, February 20, 2024 @ 5:00 PM.
A Special Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held at Frankfort City Hall located at 315 W. 2nd Street, Frankfort, KY 40601 on Monday, February 12, 2024 beginning at 3:00 p.m. or as soon thereafter as possible.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Wednesday, February 7, 2024, at 5:30 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The Board Members will not be present in person for the meeting.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard & on FPB Cable 10 and HD on Channel 510.
The Electric and Water Plant Board of the City of Frankfort, KY will hold a Special Board Meeting to conduct a Public Hearing on Tuesday, January 16, 2024 at 5:00 p.m.
The Electric and Water Plant Board of the City of Frankfort, KY will hold a Special Board Meeting to conduct a Public Hearing on Tuesday, January 16, 2024 at 5:00 p.m.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Monday, December 11, 2023, at 3:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The Board Members will not be present in person for the meeting.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
I, John Cubine, Chairman of the Frankfort Plant Board, hereby call the Special Meeting of the Frankfort Plant Board for Wednesday, November 29, 2023, at 1:00 p.m.
Per KRS 61.826, this meeting is a video teleconference meeting. One or more members of the Frankfort Plant Board will participate via Zoom or a similar video teleconferencing system. The Board Members will not be present in person for the meeting.
The Frankfort Plant Board is providing members of the public the following video link to access the meeting: www.facebook.com/fewpb www.youtube.com/frankfortplantboard& on FPB Cable 10 and HD on Channel 510.
A Regular Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held at in the Community Room of the Frankfort Plant Board Administration building located at 151 Flynn Ave., Frankfort, KY 40601 on Tuesday, October 17, 2023, beginning at 5:00 p.m.
Meeting Minutes
Approved minutes from past meetings of the Electric & Water Plant Board of the City of Frankfort, Kentucky.
Meeting Videos
FPB Board of Directors Board Meeting held on October 15, in Frankfort, KY.
FPB Board of Directors Board Meeting held on September 16, in Frankfort, KY.
FPB Board of Directors Board Meeting held on August 20, in Frankfort, KY.
FPB Board of Directors Board Meeting held on June 18, in Frankfort, KY.
FPB Board of Directors Board Meeting held on July 2, in Frankfort, KY.
FPB Board of Directors Board Meeting held on May 20, in Frankfort, KY.
FPB Board of Directors Board Meeting held on April 29, in Frankfort, KY.
FPB Ethics Committee Meeting held on April 18, in Frankfort, KY.
FPB Board of Directors Board Meeting held on April 16, in Frankfort, KY.
FPB Ethics Committee Meeting held on April 3, in Frankfort, KY.
FPB Board of Directors Board Meeting held on March 19, in Frankfort, KY.
FPB Board of Directors Board Meeting held on February 20, in Frankfort, KY.
FPB Board of Directors Board Meeting held on February 7, in Frankfort, KY.
FPB Board of Directors Board Meeting held on January 16, in Frankfort, KY.
FPB Board of Directors Special Meeting held on December 11, in Frankfort, KY.
FPB Board of Directors Special Meeting held on November 29, in Frankfort, KY.
FPB Board of Directors Meeting held on November 14, in Frankfort, KY.
FPB Board of Directors Meeting held on October 17, in Frankfort, KY.
FPB Board of Directors Meeting held on September 19, in Frankfort, KY.
FPB Board of Directors Meeting held on August 25, in Frankfort, KY.
FPB Board of Directors Meeting held on August 22, in Frankfort, KY.
FPB Board of Directors Meeting held on April 18, in Frankfort, KY.
FPB Board of Directors Meeting held on March 21, in Frankfort, KY.
FPB Board of Directors Meeting held on January 17, in Frankfort, KY.
Meeting Presentations
The 1898 & Co. Cost of Service and Rate Design Report presentations from the May 16, 2023, board meeting.
The 1898 & Co. presentation from the May 16, 2022, special board meeting.
Presentation of the Energy Efficiency Program Plan Final Report for FPB by VEIC.
Consistent with FCC regulations, Frankfort Plant Board (FPB) provides this information about our broadband Internet access services. We welcome questions or comments about this information. You may contact us in person at 151 Flynn Avenue, Frankfort, KY 40601, or by phone at 502-352-4372.
The following is a presentation of slides provided by Engineering Associates, LLC, represented by Mr. Thomas Grigg, P.E., and their associate partner Mr. Kim Kersey, Principal of Kersey Consulting Services, LLC.
FPB hosts Keith C. Chasteen, Natural Resources Management Specialist at the US Army Corps of Engineers, Louisville District for a presentation, "Habitat Enhancement for Pollinators: Management strategies to reduce mowing and for providing other benefits." Recorded July 11, 2017.
Strand Associates presents 3D models of reservoir roof options to Board of Directors of FPB and public at Special Meeting of FPB on May 30, 2017.
Presentation from Crom covering the design of prestressed concrete tanks and the various roof options available. This video is an excerpt from the April 18, 2017 FPB Board of Directors Meeting.
City of Frankfort, Parks, Recreation and Historic Sites Department responds to FPB's request to have Juniper Hills as a possible location for a new water reservoir.
Assessment to identify and compare types of renewable energy resources including wind, solar PV, hydro energy, and alternative fuel. Presented at the January 17 regular board meeting.
KyMEA Assessment of Renewable Energy Resources. The analyses presented in this Assessment of Renewable Resource Options are intended to be used by KyMEA to screen potential options, narrow the list for further consideration, and provide a greater understanding of the key issues that will need to be considered in structuring procurement processes and evaluating proposals received from prospective suppliers.
Presentation to the Frankfort Plant Board Regarding Questions Raised by Envision Franklin County and Synapse Energy Economics Concerning the AR Contract and KyMEA Power Supply Portfolio
This document was prompted by the KY Division of Water’s issuance of a Level 1 Drought Advisory on November 10, 2016. It summarizes the central KY drought conditions, KY River flows and FPB’s water treatment status as of that date. Kentucky drought status information - presented November 15, 2016
Cable Documents
Consistent with FCC regulations, Frankfort Plant Board (FPB) provides this information about our broadband Internet access services. We welcome questions or comments about this information. You may contact us in person at 151 Flynn Avenue, Frankfort, KY 40601, or by phone at 502-352-4372.
As a subscriber to cable service from Frankfort Plant Board (FPB) you are entitled under Section 631 of the Cable Communications Policy Act of 1984 (the “Cable Act”) to know the limitations imposed upon cable operators in the collection and disclosure of personally identifiable subscriber information, the type of personally identifiable information we collect, how we use subscriber information, under what conditions we may disclose such information, the period during which we maintain it and the rights of subscribers concerning such information and its disclosure.
The following is a presentation of slides provided by Engineering Associates, LLC, represented by Mr. Thomas Grigg, P.E., and their associate partner Mr. Kim Kersey, Principal of Kersey Consulting Services, LLC.
Electric Documents
1. What is the KYMEA? The Kentucky Municipal Energy Agency is a joint action agency that was formed by FPB and other municipal utilities in 2015 to help members secure electric power more efficiently and at lower costs than they could individually. KYMEA does not currently generate electricity but serves as a power purchaser for the group of municipal utilities. FPB is a member of KYMEA and FPB’s General Manager is a member on the Board.
Please see the links below to view the Community Solar public comments and FPB’s response.
The 1898 & Co. Cost of Service and Rate Design Report presentations from the May 16, 2023, board meeting.
The Frankfort Plant Board has accepted a proposal for a Community Solar project from Solar Energy Solutions.
In October 2021, the FPB Board approved an agreement with 1898&Co. to conduct a limited electric rate study to evaluate the existing tariff, and recommend new rate classifications where the existing may be insufficient. This report was delivered to the Board in February 2022.
The purpose of this project was to develop an energy efficiency program plan for the Frankfort Plant Board (FPB). While developing this plan, VEIC was encouraged to engage customers, community members, Board members, and FPB staff and incorporate their input into the final program plan.
Presentation of the Energy Efficiency Program Plan Final Report for FPB by VEIC.
Presentation of the Energy Efficiency Program Plan Final Report for FPB by VEIC.
KyMEA Board Meeting held on January 25th, 2018 at the FPB Administration Building in Frankfort, KY.
Kentucky Municipal Energy Agency - Projections of All Requirements (“AR”) Costs and Rates - For Use in the AR Members’ Planning Processes
AR Members’ Power Supply Future - Working Together through Kentucky Municipal Energy Agency (KyMEA) - the Members’ Interlocal Power Agency
This document is E3's strategy alternatives for Frankfort Plant Board's participation in KyMEA.
This document is the response of Kentucky Municipal Energy Agency to the Energy + Environmental Economics, INC. report to the Electric and Water Plant Board of the City of Frankfort, Kentucky (FPB) and to FPB requests adopted on June 20, 2017.
This document is E3's recommendation for FPB's participation in KyMEA. This is a redacted version.
This is the PPA for base load capacity and energy between KyMEA and Illinois Power Marketing Company.
This is the FPB resolution approving of the creation of the Kentucky Municipal Energy Agency (KyMEA)
This is the agreement creating the Kentucky Municipal Energy Agency (KyMEA)
This is the all requirements power supply contract between KyMEA and FPB.
This is the Attorney Generals appeal response approving of the redactions to the public versions of the PPAs
This is the PPA for base load capacity and energy between KyMEA and Big Rivers Electric Corporation.
With PPS redactions (9-2-16)” is the PPA for peaking capacity and energy between KyMEA and Paducah Power System
Frankfort Plan Board established that contract price, relative risks assumed and unique negotiated terms were confidentially disclosed information properly redacted from power purchase agreement.
Electric metering standards and requirements needed to safely receive electric service - revision six.
Customer electrical load information that must be submitted by the customer (or their electrician) when applying for new electric service or when changing an existing service.
Water Documents
Staff's response to Mr. Marshall’s questions at the May 31, 2022, public hearing on water rate increase.
Revised Reservoir Replacement Plan submitted by Frankfort Plant Board to City of Frankfort Planning & Community Development Department on Friday, February 14, 2020.
This is an annual report delivered by the Frankfort Plant Board (KY0370143). It meets the federal Safe Drinking Water Act (SDWA) requirement for “Consumer Confidence Reports” and contains information on the source of our water, its constituents, and the health risks associated with any contaminant. Safe water is vital to our community.
This is an annual report delivered by the Frankfort Plant Board (KY0370143). It meets the federal Safe Drinking Water Act (SDWA) requirement for “Consumer Confidence Reports” and contains information on the source of our water, its constituents, and the health risks associated with any contaminant. Safe water is vital to our community.
A look at the options being considered for replacement of the existing 130-year old water reservoir tanks.
During the comment period for the Reservoir replacement project, some general comments were received with respect to the current design criteria and location of the proposal by FPB staff. In an effort to be open and transparent, the FPB desired to have our consultant review the data and make recommendations as to location, size, type roof, and which side first (North or South basin). Strand Associates has conducted a thorough review of the data and design constraints provided by staff and has made specific recommendations for the project.
A public meeting was held on December 15, 2016 on the proposed Reservoir replacement project. The primary goal of that meeting was to inform the public about the proposed design and solicit comments about the project from the public. A public comment period was open between December 15, 2016 and January 31, 2017. As part of the engineering contract, Strand Associates along with staff, reviewed and discussed those comment received from the public comment period.
City of Frankfort, Parks, Recreation and Historic Sites Department responds to FPB's request to have Juniper Hills as a possible location for a new water reservoir.
This document outlines FPB policy regarding customer leaks that may be considered for bill adjustment.
This document outlines FPB’s actions in the unlikely event of a serious or prolonged drought. The Plan is implemented in 5 phases when the KY Division of Water issues a water shortage watch and flows in the KY River at Lock #4 reach certain trigger levels.
This document is flow information for meter sizing and specifications for large meter and fire services.