July 26 Special Board Meeting Agenda

A Special Board Meeting of the Electric and Water Plant Board of the City of Frankfort, Kentucky will be held at the Frankfort Plant Board Administration Building located at 151 Flynn Avenue, Frankfort, Kentucky, 40601, on Friday, July 26, 2019, beginning at 5:00 p.m.

This meeting will be held via video teleconference. The primary location where all parties can be seen and heard is Frankfort Plant Board Administration Building, 151 Flynn Avenue, Frankfort, KY 40601.

The alternate location for the meeting is the Dawson Trail Visitor Center, Quetico Provencial Park, ON-11, Atikokan, ONPOT ICO – (Canada).

View Document

Read More

Bid Invitation #1681(Closed)

The Frankfort Plant Board is requesting bids for erosion, drainage and stabilization improvements at its Myrick Substation. Work will be performed near energized electrical equipment. De-energizing the substation entirely is not feasible and will not be considered. Contractors with experience working in and around energized high voltage facilities are preferred. The contractor shall be responsible for the successful completion of all aspects of the project contained in the specification and attached civil construction plans. 

Due to the safety concerns of the project, work will be closely supervised by the owner. Contractors shall 

View Document

Attachment 1

Attachment 2

Attachment 3

Read More

RFQ - Septic System at WTP (Closed)

The Frankfort Plant Board is requesting quotes from licensed septic system installers in good standing for the installation of a new septic system at the water treatment plant located at 200 Coffee Tree Road in Frankfort, KY. The existing tank and lines are both in need of replacement. All work shall be done in strict adherence to all local and state septic system requirements and applicable safety/OSHA requirements. All interested contractors must visit the site and become familiar with existing constraints prior to providing quotes. Site visits can be scheduled by contacting Julie Roney at (502) 352-4350 or jroney@fewpb.com.

SUBMIT QUOTE BY: 3:00 PM – July 8, 2019

View Document

Read More

RFQ - Septic System at WTP (Closed)

The Frankfort Plant Board is requesting quotes from licensed septic system installers for the installation of a new septic system at the water treatment plant located at 200 Coffee Tree Road in Frankfort, KY. The existing tank and lines are both in need of replacement. All work shall be done in strict adherence to all local and state septic system requirements and applicable safety/OSHA requirements. All interested contractors must visit the site and become familiar with existing constraints prior to providing quotes. Site visits can be scheduled by contacting Julie Roney at (502) 352-4350 or jroney@fewpb.com. SUBMIT QUOTE BY: 4:30 PM – June 21, 2019.

View Document

Read More